PEEK Parts We Machine

Ten PEEK and high performance polymer part families from medical components to semiconductor ESD tooling.

100+CNC machines, 11 five-axis
40+precision inspection instruments
±0.005 mmstandard tolerance
19+countries served
24 hquote on complete files

Ten Part Families We Run Repeatedly

Part familyCommon materialsKey tolerancesTypical finishTypical order
Medical instrument componentsPEEK natural, implant grade+/-0.01 mm seats, ISO 13485 docsCleaned, sealed pack100 to 1,000 pcs
Semiconductor wafer handling partsESD225 / ESD420+/-0.02 mm, ESD surface resistivity certifiedDouble bagged50 to 500 pcs
Aerospace bracket replacementsPEEK + CF+/-0.02 mm, FAI per AS9102As-machined20 to 200 pcs
High temperature insulatorsPEEK natural260 C service, +/-0.02 mmAs-machined200 to 2,000 pcs
Pump internals for chemicalsPEEK virgin+/-0.02 mm, leak testedCleaned200 to 2,000 pcs
Gear and wear componentsPEEK + CF or PTFE filled+/-0.01 mm tooth featuresAs-machined200 to 2,000 pcs
PEI (Ultem) wastewater partsPEI rod direct from Germany+/-0.02 mm, Ra 0.8As-machined50 to 300 pcs
PI (polyimide) thermal isolatorsPI stock+/-0.02 mmAs-machined50 to 500 pcs
Valve seats under loadPEEK + GF30Seat flatness 0.01 mmLapped200 to 2,000 pcs
Conductive handling traysConductive nylon, ESD PEEK+/-0.05 mm pocketsESD certified100 to 1,000 pcs
How to use this page: these families run on repeat programs, so process risk is low and lead times are predictable. If your part is not listed it is likely still in scope; send the drawing and we answer within 24 hours.

Material detail and grade table: PEEK and engineering plastics. PEI case: aerospace wastewater case study.

Worked examples with full measurement data: case studies.

Get a quote in 24 h Inspection & QC Tolerance standards

Frequently Asked Questions

What tolerance can you hold on plastic parts?

On stable geometries we hold +/-0.005 mm on polymer parts, matching our metal capability; minus-material behavior like moisture uptake is planned into the process. Standard tolerance is +/-0.05 mm unless the drawing calls tighter.

Do plastic parts need annealing?

Stress relief (hot oil or air annealing) is planned per material and geometry; PTFE nearly always gets an anneal before finish passes, and PC benefits on stress-sensitive features.

Can you source certified plastic stock?

Yes, stocked rods and sheets come with mill certificates; medical-grade and ESD grades are sourced per drawing callout.

Send Your Drawing

Quote with engineering feedback within 24 hours; prototypes in 7 to 15 days.

Request a Quote

Data sources: KGL enterprise engineering standards (2022-01-08 revision, with founder-reviewed grade lists) and the Mechanical Design Handbook, 6th Edition, Volume 1, Mechanical Design Fundamentals (Chemical Industry Press). Typical values are cross-checked against the GB, JIS, ASTM/UNS, DIN/EN and ISO standards cited on each table; mill certificates and lot inspection records govern acceptance on every shipment.

Ready to machine your next part?

Send 2D/3D drawings and get a quote within 24 hours. No MOQ for prototypes.

Chat with us