Passivation for Stainless and Titanium Parts

Nitric and citric passivation per ASTM A967 for 303, 304, 316L, 17-4PH and titanium parts, with free-iron removal verified and certificates in the shipment.

Passivation at KGL

Passivation is a chemical bath, not a coating: acid removes free iron from the stainless surface and lets the chromium oxide layer rebuild, so the part resists corrosion as designed. KGL runs passivation through an audited partner line per ASTM A967, nitric or citric per the drawing, with incoming cleaning and post-process verification handled in house.

When to Choose It

Part and alloyRouteWhy
303, 304, 316L machined fittings and fluid partsASTM A967 nitric or citriccorrosion service, marine, medical adjacent
17-4PH valve and instrument partsASTM A967 per conditionH900 and aged conditions
Medical instruments and device componentsCitric route, ISO 13485 systemcleanliness documentation
Titanium parts per drawing calloutASTM F86 languageimplants and surgical tools

Specifications We Control

ItemSpecification
StandardASTM A967 (nitric 1 to 4, citric), ASTM F967 practice per drawing; F86 for titanium
Dimension changeNo measurable layer; verification after process on critical faces
VerificationWater immersion or high humidity test per A967 practice, free iron check
CertificatePassivation certificate with bath, time, temperature; RoHS/REACH available
Lead time1 to 2 working days in the normal route

How We Run It and Check It

Route we control: degrease and clean, passivate, rinse, dry, verify, pack. The A967 verification practice (water immersion or high humidity) is run per batch on witness parts. For medical parts under our ISO 13485 system, cleaning validation notes travel with the certificate. Parts that were polished or electropolished are passivated after polishing unless the drawing says otherwise.

Material side: stainless steel CNC machining, titanium CNC machining. Related finish: polishing and electropolishing.

Cross entrances: by material | CNC machining | inspection and QC.

Note: passivation pairs with our heat treatment routes on 17-4PH parts: age harden first, passivate last.
KGL at a glance: KGL Machinery & Electronics, Shenzhen since 2013. Machining and finishing under one quality system, ISO 9001:2015, ISO 13485:2016 and AS9100D certified. Finishing certificates and RoHS/REACH declarations travel with the shipment. kgl@kglmfc.com.

Frequently Asked Questions

Why does machined stainless still rust before passivation?

Free iron smears onto the surface from tooling and fixtures during cutting. It is stainless underneath, but the smeared iron rusts first. Passivation dissolves that free iron in acid without attacking the base metal, so the surface behaves like stainless again.

Nitric or citric acid, which one?

Nitric acid per ASTM A967 is the traditional route and the default on many aerospace drawings; citric routes are preferred where environmental handling or medical cleanliness matters. We follow the drawing, and where the drawing is silent we propose a route in the quote.

Does passivation change dimensions?

No measurable layer grows and only microns of surface iron are removed. Dimensions are still verified after passivation on sealing and bearing faces, and the certificate states the method used.

Do you passivate titanium too?

Yes, for medical-adjacent parts we coordinate titanium surface conditioning per drawing, commonly ASTM F86 passivation language on implants and instruments. Stainless 303, 304, 316L and 17-4PH are the everyday passivation loads.

Send Your Drawing

Quote with engineering feedback within 24 hours; prototypes in 7 to 15 days.

Request a Quote

Data sources: KGL enterprise engineering standards (2022-01-08 revision, with founder-reviewed grade lists) and the Mechanical Design Handbook, 6th Edition, Volume 1, Mechanical Design Fundamentals (Chemical Industry Press). Typical values are cross-checked against the GB, JIS, ASTM/UNS, DIN/EN and ISO standards cited on each table; mill certificates and lot inspection records govern acceptance on every shipment.

Ready to machine your next part?

Send 2D/3D drawings and get a quote within 24 hours. No MOQ for prototypes.

Chat with us